• <sub id="kz37i"></sub>

      <center id="kz37i"></center>
      <output id="kz37i"></output>

      <style id="kz37i"></style>

      亚洲国产精品无码观看久久,精品国产乱码久久久久乱码,日韩一区精品视频一区二区,亚洲综合无码一区二区,狠狠五月深爱婷婷网,麻豆人人妻人人妻人人片av,国产又大又粗又爽的毛片,精品国产三级a∨在线欧美
      Zhiguang Energy Storage Powers China’s First All-Green Power Steelmaking Project to Successful Grid Connection
      • 20
      • 2025.10.10

      Recently, the key component of the national Near-Zero Carbon Electric Furnace Demonstration Project — the Green and Low-Carbon Energy Supply Project of Jingjiang Special Steel Co., Ltd. — was successfully connected to the grid. This project marks China’s first multi-scenario wind-solar-storage integrated microgrid demonstration in the steel industry, representing a milestone in the industry’s transition toward green and low-carbon manufacturing.

      As the core equipment system supplier, Zhiguang Energy Storage provided a world-leading grid-forming high-voltage cascaded energy storage system, enabling the client to build a pioneering all-green power supply system for special steel smelting in China.


      Jingjiang Special Steel Green and Low-Carbon Project serves not only as a national pilot for low-carbon metallurgy technologies but also as a complex and forward-looking system project. It integrates 57.97 MW of distributed PV, 37.5 MW of wind power, and a 120 MW/240 MWh user-side grid-forming high-voltage direct-connection energy storage system. Through an intelligent energy management platform, the system achieves multi-energy synergy and energy-carbon traceability. As the largest user-side energy storage station in Jiangsu Province, the project is expected to increase green power utilization by 168 million kWh annually, reducing carbon dioxide emissions by approximately 52,000 tons per year. It provides a replicable and scalable engineering model for green power substitution and near-zero-carbon steelmaking across the industry.


      Steelmaking is a typical high-load, impact-type process that demands exceptional grid stability, power quality, and supply reliability. Achieving 100% green power for electric furnace steelmaking requires overcoming challenges posed by the intermittency and volatility of renewable energy.

      In this project, Zhiguang Energy Storage supplied two grid-forming high-voltage cascaded energy storage systems totaling 45 MW/90 MWh, serving as the core technology enabler for the “all-green power steelmaking” goal. The systems feature several leading capabilities:

      Grid-forming capability: Actively establishes and stabilizes grid voltage and frequency, providing reliable inertia and short-circuit capacity for wind-solar-storage microgrids, enhancing system resilience.

      Blackstart function: Enables rapid microgrid restoration during grid outages, ensuring continuous operation of critical loads and significantly improving power reliability.

      3x overcurrent capability: Effectively mitigates severe power fluctuations caused by electric arc furnace impacts, maintaining stable bus voltage and ensuring smooth, safe green power supply throughout the steelmaking process.

      Cascaded high-voltage topology: Allows direct connection to 6–35 kV voltage levels without a step-up transformer, offering higher system efficiency and faster response—ideal for large-scale industrial applications.

      With its robust grid-forming technology, Zhiguang Energy Storage successfully resolved the final stability challenge of applying renewable energy directly to steelmaking, achieving real-time dynamic balance and coordinated control across generation, grid, load, and storage.


      The successful grid connection of Jingjiang Special Steel project marks a major breakthrough in the deep integration of renewable energy within industrial sectors. It also stands as a benchmark for the role and value of grid-forming energy storage technology in the new power system. Leveraging extensive experience in grid-forming demonstration projects, Zhiguang Energy Storage continues to drive advancements in control functions, strategies, and core technologies—solidifying its position as a key technology provider supporting high renewable penetration and zero-carbon transformation in industrial enterprises.


      Looking ahead, Zhiguang Energy Storage will continue to advance grid-forming energy storage technologies, working alongside partners in steel, petrochemical, data centers, and other high-end manufacturing sectors to deliver safer, more efficient, and greener integrated energy solutions—contributing to China’s dual-carbon goals.

      主站蜘蛛池模板: 九九在线精品国产| 国产视频最新| 国产AV影片麻豆精品传媒| 中文乱码字幕在线中文乱码| 最近中文字幕国产精品| 丰满爆乳一区二区三区| 99亚洲男女激情在线观看| 精品无码三级在线观看视频| 欧美一性一乱一交一视频| 日韩一区二区三区一级片| 綦江县| 久久人人妻人人爽人人爽| 亚洲欧美日韩综合一区二区| 久热这里只精品视频99| 蜜臀av在线观看| 欧美牲交a欧美牲交aⅴ一| 国产精品国产精品国产专区不卡| 偷拍精品一区二区三区| 国产女人在线视频| 影视先锋av资源噜噜| 国产成人无码| 久久人妻精品国产| 91久久偷偷做嫩草影院免费看 | 久久精品蜜芽亚洲国产av| 激情综合五月丁香亚洲| 国产av普通话对白国语| 欧美性猛交xxxx乱大交丰满| 国产精品人成在线播放蜜臀| 麻豆成人av不卡一二三区| 国产片av在线观看国语| 国产精品中文字幕视频| 麻豆国产AV剧情偷闻女邻居内裤| 亚洲熟女少妇乱色一区二区| 男女xx00上下抽搐动态图| 国产精品综合av一区二区| 国产良妇出轨视频在线观看| 国产精品一区二区黄色片| 一 级做人爱全视频在线看| 中文字幕国产精品二区| 无码国内精品久久人妻蜜桃| 夜鲁鲁鲁夜夜综合视频|